Comment on page
Guidelines and Best Practices to Build and Use PM Blocks
Follow these guidelines and best practices when building PM Blocks.
Follow these guidelines when building PM Blocks.
When building the configuration settings for a PM Block, in the Name setting, specify the label for that PM Block when it is placed into a Process model. This label is different than the name of the PM Block as it displays in the PM Blocks page.
Every PM Block must have one of the following Start-type events in its Process model:
When building the configuration settings for a PM Block, in the Start Event Drop Down setting, select the Start-type event that triggers that PM Block. Without this setting configured, the PM Block never triggers regardless of conditions in that Request. Therefore, this is a required configuration.
Only one Start-type event may be used in the Process model for a PM Block.
​
Last modified 2mo ago