Snap a Process Model Object Onto an Existing Sequence Flow

Snap a process model object onto a sequence flow.

Snap a Modelling Object onto an Existing Flow

Manage and modify the activity flows within the system while maintaining the integrity of the process.

Your user account or group membership must have the following permissions to copy Process model objects and/or PM Blocks unless your user account has the Make this user a Super Admin setting selected:

  • Processes: Edit Processes

  • Processes: View Processes

See the Process permissions or ask your Administrator for assistance.

Follow these steps to snap a process model object onto a sequence flow:

  1. Select the Process model object to snap onto a sequence flow.

  2. Drag it over a sequence flow between two other objects.

  3. Hold it for a few seconds until the cursor shows the pointing hand or until the flow line turns blue and Drop to add to this flow message displays.

  4. Drop the object onto the flow. It will snap to the flow, effectively splitting it between the two other objects. The existing flow configuration of the split flow is preserved on the inbound flow of the added object, while the outbound flow is new.

Collaborate During Process DesignPin a Process Model ObjectCustomize the Appearance of a Process Model ObjectCopy Process Model Objects into the ClipboardClone Process Model Objects Without the ClipboardSelect Multiple Process Model ObjectsAlign and Distribute Process Model ObjectsDelete Process Model ObjectsUndo and Redo Changes in Your Process ModelNavigate Around Your Process ModelDiscard Changes to Your Process ModelClose Process Modeler with Your Saved ChangesPublish Your Process ModelValidate Your Process is BPMN 2.0 CompliantOptimize Your ProcessWhat is Process Modeling?

Last updated

Logo

© 2024 ProcessMaker, Inc. All Rights Reserved. Except as otherwise permitted by ProcessMaker, this publication, or parts thereof, may not be reproduced in any form, by any method, for any purpose.