Snap a Process Model Object Onto an Existing Sequence Flow

Snap a process model object onto a sequence flow.

Snap a Modelling Object onto an Existing Flow

Manage and modify the activity flows within the system while maintaining the integrity of the process.

Your user account or group membership must have the following permissions to copy Process model objects and/or PM Blocks unless your user account has the Make this user a Super Admin setting selected:

  • Processes: Edit Processes

  • Processes: View Processes

See the Process permissions or ask your Administrator for assistance.

Follow these steps to snap a process model object onto a sequence flow:

  1. Select the Process model object to snap onto a sequence flow.

  2. Drag it over a sequence flow between two other objects.

  3. Hold it for a few seconds until the cursor shows the pointing hand or until the flow line turns blue and Drop to add to this flow message displays.

  4. Drop the object onto the flow. It will snap to the flow, effectively splitting it between the two other objects. The existing flow configuration of the split flow is preserved on the inbound flow of the added object, while the outbound flow is new.

pageCollaborate During Process DesignpagePin a Process Model ObjectpageCustomize the Appearance of a Process Model ObjectpageCopy Process Model Objects into the ClipboardpageClone Process Model Objects Without the ClipboardpageSelect Multiple Process Model ObjectspageAlign and Distribute Process Model ObjectspageDelete Process Model ObjectspageUndo and Redo Changes in Your Process ModelpageNavigate Around Your Process ModelpageDiscard Changes to Your Process ModelpageClose Process Modeler with Your Saved ChangespagePublish Your Process ModelpageValidate Your Process is BPMN 2.0 CompliantpageOptimize Your ProcesspageWhat is Process Modeling?

Last updated

© Copyright 2000-2024 ProcessMaker Inc. All rights reserved.